Our Solution
The concept is simple. We bring all the variables associated with the engineering and construction of a typical central plant into an energy and space efficient cabinet where all electrical, pumps, piping, controls, cooling tower, and chillers can be assembled and manufactured in a controlled environment. This integrated packaging concept provides maximum efficiency at the lowest possible cost to the building owner..
The Chil-Pak® Central Plant Solution™ reduces engineering design time as well as the high cost of field labor for mechanical room construction. Chil-Pak®modularized plants have a significantly smaller footprint than field constructed plants thereby eliminating the owner’s initial investment of expensive mechanical room building. Overall these advantages lead to a reduced CAPEX on your next building project.
Chil-Pak® has the ability to use efficient, water cooled screw, centrifugal, and oil free chiller systems for a variety of applications. Multiple Chil-Pak®units can also be connected in parallel for even larger applications up to 6,000+ tons. Finally, it makes sense to “think INSIDE the box”.
Gallery